株式会社平和
再生可能エネルギーの積極的な活用[L] | 株式会社平和

Active use of renewable energy

               

With the aim of protecting the environment, the Heiwa Group is actively introducing solar power generation and wind power generation equipment in idle plots of land at factories and golf courses.
The total estimated annual power generation of these power generation facilities is 3.76 million kWh, equivalent to the annual power consumption of about 1,040 ordinary households.
By using renewable energy sources, the Heiwa Group is reducing emissions of CO₂, a primary cause of global warming. The annual CO₂ reduction equates to about 1,517 tons, establishing a mechanism capable of contributing to the environment for a long time.

Gunma Factory

     
Installed location 2721-1 Sanwa-cho, Isesaki, Gunma Prefecture
Installed area Approximately 11,053 m²
Maximum output 1,435kW
Number of panels 6,730
Projected annual power generation Approximately 1.31 million kWh
Start of power generation September 2005

 

群馬工場のシンボルでもある風車
The windmill that is a symbol of the Gunma Factory

OLYMPIA CO., LTD has introduced solar power generation and wind power generation equipment at its Gunma Factory following the factory's completion in 2005.
In response to growing interest in natural energy, the company expanded its solar power generation facility in 2013, currently operating it as a Mega Solar power generation facility with a maximum output of 1,435 kW.

Akabori Factory

赤堀工場
Installed location 2-1818 Kobayashi-cho, Isesaki, Gunma Prefecture
Installed area Approximately 5,714 m²
Maximum output 887kW
Number of panels 3,480
Projected annual power generation Approximately 870,000 kWh
Start of power generation October 2014

We have also installed solar power generation equipment at our Akabori Factory, and began power generation in October 2014.

Katsuta Golf Club

勝田
Installed location 1506-1 Nagasuna, Hitachinaka, Ibaraki Prefecture
Installed area Approximately 27,037 m²
Maximum output 1,638kW
Number of panels 6,552
Projected annual power generation Approximately 1.58 million kWh
Start of power generation June 2014

We installed solar power generation equipment on idle land at the Katsuta Golf Club owned by the PGM Group, and started power generation in June 2014. This achieves both the effective utilization of idle land and the production of environmentally friendly renewable energy.